AKINCI HEPP May-2018

KÖMKÖY HEPP
23 February 2014

VOITH Turbine and INDAR Generator cooling water needs are provided by the cooling water system which is completely designed, routed and supplied by MED including the local electrical control panel design, manufacturing and installation. Materials had been delivered to site. Itis scheduled to complete installation and commissioning of the systems in May 2018.