TCO Oil Field development 2014-Ongoing Tengiz – Kazakhstan
24 January 2017Mafumeria Sul Project Epci 4 Off Shore Plant 2014-2015 Cabinda – Angola
24 March 2014
Subcontractor for the DS and Sicim JV –ENI site, successfully have completed in total of 110,000 inch of spool fabrication and installation at their relevant locations at 52 well Hook ups and 5 degassing stations. Our civil, coating team, painting team, Tie-in team and platform team have completed all related activities in the pipeline section and the piping section of the project. main drive to those activities took an early start of all of welding 250 km of different size of flow lines and oil transfer lines of different sizes (6, 8, 10, 16, 24, 36 and 52 inch).